A quick “looks good” can refer to yesterday’s image or a different offer. Use this original checklist to tie a decision to one exact post version and its intended accounts. It works with your current planner; using the sheet does not configure, approve or stop a post in any software.
Keep one clear release record.
In the PDF or editable copy, write a reference, caption version, media filename/version, final destination and publishing time with its timezone. Add a separate row for each channel/account. Keep the actual caption and media in your approved work system and put a private evidence reference in the sheet.
Illustrative example, not a live client post
Post / version
Media / destination
Account / time
Decision / owner
SALON-07 / caption v2
midweek-v2.jpg / approved booking page
Salon Facebook Page / 12 Nov, 10:00, Asia/Karachi
Awaiting owner review; hold
Check the final landing page on a phone. A correct caption cannot fix an expired offer, the wrong branch or a booking button that is hard to use.
Make the decision unambiguous.
Suggested review message: “Please approve SALON-07, caption v2, midweek-v2.jpg, the linked booking page, the named account and 12 November at 10:00 Asia/Karachi. Reply Approve this version or Hold with the changes required before 11 November at 16:00. No reply means hold.” Replace every example detail.
This is a team operating rule, not a claim that software locks an approved version or automatically requests approval again after edits. The publishing owner is responsible for checking the actual scheduled state.
If you use HighLevel, check the release behavior.
HighLevel documents internal review in Social Planner. Approval can place the post on its publishing schedule, so verify the date and time before approving. Email alerts depend on notification settings; check the pending queue even when no email arrives. See the practical approval process for the current setup labels and owner checks.
Hold changes and check failures before retrying.
A different price, link, image, account or time needs a new sign-off under this checklist. Tell the publishing owner immediately and verify the old schedule has actually been moved or removed. If a send fails or its outcome is uncertain, inspect the destination first. Record any live link and let one owner decide whether a specific channel needs a retry.
These downloads are manual planning records. Keep credentials and customer details out of shared copies. A passed checklist is evidence of your observations, not a certified integration test or a promise of successful delivery.
Record the behavior you observed.
TEST 01
Exact version and right account
Compare a sample approval record against the actual caption, media, final destination and selected social account. Change one detail in the sample and check the reviewer catches it.
Expected outcome
The reviewer can identify the exact approved version and each intended account. A changed detail needs a fresh decision.
TEST 02
Link and offer agree on a phone
Open the sample final destination on a phone. Check the correct service/location, stated price or dates, usable buttons and a working next step without submitting a real enquiry.
Expected outcome
The final page matches the post and the next action is usable on a phone. A wrong, expired or broken destination blocks release.
TEST 03
Approval has a safe publishing time
Use a controlled test account and harmless sample post with a future time. Confirm timezone before approval, then inspect the saved schedule. Do not publish a test to customers.
Expected outcome
The approver checks date, time and timezone before approval; the saved schedule matches. Approval may schedule publishing.
TEST 04
No decision or no email
Run a tabletop test with the approver unavailable and no notification received. Ask the publishing owner to find the pending item and apply the agreed hold and backup plan.
Expected outcome
No response is treated as a hold. The publishing owner checks pending work directly and uses the named backup.
TEST 05
Last-minute change and stop check
In a controlled sample, change the image after sign-off. Have the owner move the scheduled time safely or remove that single scheduled item, then verify its actual state.
Expected outcome
The old schedule is verified stopped or moved before a new version is approved. A changed worksheet is not proof of a stop.
TEST 06
Failure without a duplicate post
Discuss a sample failed or uncertain send. Check the destination account first, record any live link, assign one retry owner and confirm the specific channel before retrying.
Expected outcome
A real destination check precedes a retry. Already-live copies are not reposted; uncertainty goes to one owner.
Prepared November 7, 2026 by Kashif Rehman. Original planning examples and test records; no customer results or automatic system verification are claimed.
Product information checked November 7, 2026. Confirm current settings and account-specific terms.